Field installation LoviSil® branch joint in windpark

The special version LoviSil® 20 kV branch joint is suitable for supplying power to the existing network through wind mills, biomass installations and photovoltaic installations.


The joint passed the abridged test and in October 2011 a field trial took place at the German utility E.ON Hanse. Installation was performed with a number of E.ON engineers. Although autumn weather had left its marks, leaving the soil very moist, the installation went very well. Sales Support Engineer Herman Matser: “Installations under these conditions require creativity: you must make sure the cable is well supported and remains above water. And your tools must be easy to handle.”

Other network companies have also shown interest for this application.

Products in this project

Feed in joint for sustainable energy
© 2018 Lovink Enertech B.V.  |  
Webdesign en CMS: Frappant